Measure access and placement
Check doorways, stairs, lifts, site access and the final placement. Share measurements or drawings with the supplier and installer.
Confirm utilities for your model
Obtain the exact plumbing, drainage and electrical requirements. Have suitable qualified professionals review the site and plan the work.
Leave room for maintenance
Confirm how pumps, controls, drains and other serviceable parts can be reached after installation. Do not enclose equipment without appropriate access.
Agree responsibilities
Confirm who handles unloading, moving into position, connections, commissioning and any civil work. Record the scope in your quotation.
This guide supports planning. Follow the model-specific instructions and the requirements applicable to your installation.